Saturday workday

We had a very productive workday in the dining hall last Saturday. The permanent exhaust vents and drains were installed on the dining hall furnaces. In the kitchen some trim work was completed around the window and the bulkhead framing completed above the new exhaust hood. Once the electrial power is installed to the hood, we will be ready for drywall. Thanks to all that helped, God Bless each of you.

Summer of 2012

We already have several camps scheduled for the summer of 2012. If you are interested in using the camp for a camp this summer, you can check the on line calendar to see what weeks are already unavailable. Contact the caretaker as soon as possible to schedule a time period. If you have any questions, please let us know.

Hood being installed

The installation of the hood in the kitchen began yesterday. The hood was installed and the duct was put in through the roof. Today they plan to get the fire surpression system in and finish up. Thanks to everyone who made this possible. God Bless each of you.