New West Shower House started!!

The footer for the new showerhouse to be located on the west side of the campground was poured late Friday evening, with completion coming after dark. Thanks to the crew, Don Donovan, Peter Donovan, Bob DeCamp, and Dan Baty who go the job done after working all day on their regular jobs. Thanks to the concrete truck drivers who worked late on a Friday evening to get the job done. Thanks and God Bless Each of YOu!! The next step will be getting the foundation block lain up, then install all the drains, fill with sand and pour the floor. If anyone would like to help with any phase of the project, let us know.

Comments

Popular posts from this blog

The campground board would like to thank everyone who helped move kitchen equipment today. Jack's Fine Foods of Brazil donated a commercial refrigerator and convection oven to the campground. Convection ovens are very heavy and it took many hands to get it safely moved to the dining hall. Thanks again to each of you, may God Bless each of you. We also finished up cleaning the range hood and also got it moved into the dining hall. The next project is to get it installed.

Exhaust hood has arrived

After an afternoon of work, the exhaust hood that the campground purchased was lowered from the ceiling of the former Brazil Legion, moved outside without a great deal of trouble and a lot of brut force, loaded into a trailer and moved to the campground where it awaits a lot of degreaser and power washing. Once it is cleaned, we will then start the process of getting it installed. We also moved a small comercial refrigerator that we purchased which will allow us to only have to use our large one when we have very large groups. Thanks to all who helped, God Bless each of you.